Cargando…

Construction Project Management.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Sears, S. Keoki
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Wiley, 2015.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a22000007a 4500
001 EBOOKCENTRAL_ocn903318973
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |n|||||||||
008 150213s2015 xx ob 001 0 eng d
040 |a IDEBK  |b eng  |e pn  |c IDEBK  |d CDX  |d COO  |d OCLCO  |d RECBK  |d OCLCF  |d DEBSZ  |d OCLCQ  |d EYM  |d OCLCO  |d EBLCP  |d OCLCQ  |d OCLCO  |d OCLCQ 
020 |a 1322881111  |q (ebk) 
020 |a 9781322881119  |q (ebk) 
020 |a 9781118745250 
020 |a 1118745256 
020 |a 9781118745267 
020 |a 1118745264 
020 |a 9781118745052 
020 |a 1118745051 
029 1 |a DEBSZ  |b 475038479 
035 |a (OCoLC)903318973 
037 |a 719393  |b MIL 
050 4 |a TH438 
082 0 4 |a 690  |2 23 
084 |a TEC005000  |2 bisacsh 
049 |a UAMI 
100 1 |a Sears, S. Keoki. 
245 1 0 |a Construction Project Management. 
260 |b Wiley,  |c 2015. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Print version record. 
504 |a Includes bibliographical references and index. 
505 0 |a Cover -- Title Page -- Copyright -- Contents -- Preface -- 1 Construction Practices -- 1.1 Introduction -- 1.2 The Construction Industry -- 1.3 The Construction Project -- 1.4 Project Stages -- 1.5 Owner -- 1.6 Architect-Engineer -- 1.7 Prime Contractor -- 1.8 Competitive Bidding -- 1.9 Negotiated Contracts -- 1.10 Combined Bidding and Negotiation -- 1.11 Subcontracting -- 1.12 Design-Bid-Construct -- 1.13 Fast Tracking -- 1.14 Construction Contract Services -- 1.15 Construction Services -- 1.16 Design-Construct -- 1.17 Construction Management -- 1.18 Fixed-Sum Contract 
505 8 |a 1.19 Cost-Plus-Fee Contracts -- 1.20 Work-by-Force Account -- 1.21 Turnkey and BOT Contracts -- 1.22 Integrated Project Delivery -- 1.23 Speculative Construction -- 1.24 Management during the Design Phase -- 1.25 Management of Field Construction -- 1.26 Project Manager -- 1.27 Project Manager Qualifications -- Key Points and Questions -- 2 Systematic Project Management -- 2.1 Introduction -- 2.2 Need for Project Management -- 2.3 Project Management Characteristics -- 2.4 Discussion Viewpoint -- 2.5 Management Procedures -- 2.6 Time and Cost Management -- 2.7 Planning and Scheduling 
505 8 |a 2.8 CPM Procedure -- 2.9 Time Monitoring and Control -- 2.10 Project Cost System -- 2.11 Estimating the Project -- 2.12 Project Cost Accounting -- 2.13 Resource Management -- 2.14 Project Financial Control -- 2.15 Automating Project Management Tasks -- 2.16 Manual Methods -- 2.17 Discussion Format -- 2.18 Example Projects -- Key Points and Questions -- 3 Project Estimating -- 3.1 Introduction -- 3.2 Project Cost System -- 3.3 Preliminary Cost Estimates -- 3.4 Final Cost Estimate -- 3.5 Example Projects -- 3.6 Quantity Survey -- 3.7 Management Input -- 3.8 Field Supervision 
505 8 |a 3.9 Construction Methods -- 3.10 General Time Schedule -- 3.11 Construction Equipment -- 3.12 Summary Sheets -- 3.13 Material Costs -- 3.14 Labor Costs -- 3.15 Indirect Labor Costs -- 3.16 Labor Unit Costs -- 3.17 The Cost of Heavy Equipment -- 3.18 Bids from Subcontractor -- 3.19 Project Overhead -- 3.20 Home Office Overhead -- 3.21 Markup -- 3.22 Contract Bonds -- 3.23 Recap Sheet -- 3.24 Cost Models -- 3.25 Project Budget -- 3.26 Progress Estimate -- 3.27 Estimating for Changes -- Key Points and Questions -- 4 Project Planning -- 4.1 Introduction -- 4.2 CPM Procedure -- 4.3 Planning Phase 
505 8 |a 4.4 Job Activities -- 4.5 Job Logic -- 4.6 Restraints -- 4.7 Beginning-to-End Planning -- 4.8 Top-Down Planning and the Work Breakdown Structure -- 4.9 Precedence Notation -- 4.10 Precedence Diagram -- 4.11 Network Format -- 4.12 Lag Relationships -- 4.13 Precedence Diagram for the Example Projects -- 4.14 Value of Precedence Network -- 4.15 Repetitive Operations -- 4.16 Network Interfaces -- 4.17 Master Network -- 4.18 Subnetworks -- 4.19 Computer Applications for Planning -- Key Points and Questions -- 5 Project Scheduling Concepts -- 5.1 Introduction -- 5.2 Scheduling Procedure 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Construction industry  |x Management. 
650 0 |a Project management. 
650 6 |a Construction  |x Industrie  |x Gestion. 
650 6 |a Gestion de projet. 
650 7 |a Construction industry  |x Management  |2 fast 
650 7 |a Project management  |2 fast 
655 0 |a Electronic books. 
776 0 8 |i Erscheint auch als:  |n Druck-Ausgabe 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=7104021  |z Texto completo 
936 |a BATCHLOAD 
938 |a Coutts Information Services  |b COUT  |n 30591151 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL7104021 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis30591151 
938 |a Recorded Books, LLC  |b RECE  |n rbeEB00596261 
994 |a 92  |b IZTAP