|
|
|
|
LEADER |
00000cam a2200000Mu 4500 |
001 |
EBOOKCENTRAL_ocn880058502 |
003 |
OCoLC |
005 |
20240329122006.0 |
006 |
m o d |
007 |
cr |n||||||||| |
008 |
140517s2014 xx ob 001 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d OCLCQ
|d E7B
|d DEBSZ
|d C6I
|d OCLCQ
|d LOA
|d OCLCO
|d OCLCF
|d OCLCO
|d CNNOR
|d PIFBY
|d ZCU
|d MERUC
|d OCLCQ
|d OCLCO
|d U3W
|d STF
|d OCLCQ
|d INT
|d OCLCQ
|d N$T
|d YDXCP
|d IDEBK
|d DG1
|d CUS
|d COO
|d UKMGB
|d DEBBG
|d LIP
|d ICG
|d AU@
|d G3B
|d TKN
|d OCLCQ
|d DKC
|d OCLCQ
|d AZN
|d OCLCQ
|d TUHNV
|d OCLCO
|d OCLCQ
|d OCLCO
|
066 |
|
|
|c (S
|
016 |
7 |
|
|a 016559774
|2 Uk
|
019 |
|
|
|a 879677974
|a 992922970
|
020 |
|
|
|a 9781118649251
|
020 |
|
|
|a 1118649257
|
020 |
|
|
|a 9781118649244
|
020 |
|
|
|a 1118649249
|
020 |
|
|
|z 1848215533
|
020 |
|
|
|z 9781848215535
|
029 |
1 |
|
|a DEBBG
|b BV043609237
|
029 |
1 |
|
|a DEBSZ
|b 431685754
|
029 |
1 |
|
|a AU@
|b 000059331804
|
029 |
1 |
|
|a CHBIS
|b 010259601
|
029 |
1 |
|
|a CHNEW
|b 000943114
|
029 |
1 |
|
|a CHVBK
|b 480233322
|
029 |
1 |
|
|a DEBBG
|b BV042744806
|
029 |
1 |
|
|a DEBBG
|b BV043396767
|
029 |
1 |
|
|a DEBSZ
|b 485048418
|
035 |
|
|
|a (OCoLC)880058502
|z (OCoLC)879677974
|z (OCoLC)992922970
|
050 |
|
4 |
|a TA169
|
072 |
|
7 |
|a BUS
|x 082000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 041000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 042000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 085000
|2 bisacsh
|
082 |
0 |
4 |
|a 006
|
049 |
|
|
|a UAMI
|
100 |
1 |
|
|a Rezg, Nidhal.
|
245 |
1 |
0 |
|a Joint Optimization of Maintenance and Production Policies.
|
260 |
|
|
|a Hoboken :
|b Wiley,
|c 2014.
|
300 |
|
|
|a 1 online resource (149 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
490 |
1 |
|
|a FOCUS Series
|
588 |
0 |
|
|a Print version record.
|
520 |
8 |
|
|a Annotation
|b This book presents the recent work regarding the different approaches developed in the framework of the joint optimization of intelligent maintenance and production strategies. The originality of these strategies is that they take various constraints into account, including production management, subcontracting environmental degradation, inspection and product quality.
|
504 |
|
|
|a Includes bibliographical references and index.
|
505 |
0 |
|
|6 880-01
|a Cover; Title Page; Copyright; Contents; INTRODUCTION; CHAPTER 1. JOINT OPTIMIZATION OF PREVENTIVE MAINTENANCE ANDINVENTORY CONTROL -- ANALYTICAL APPROACH; 1.1. Introduction; 1.2. Description problem and notations; 1.3. Analytical study; 1.3.1. The maintenance cost model; 1.3.2. Inventory control cost model; 1.3.3. The expression of the average total cost per time unit; 1.4. Optimization; 1.5. Numerical example and sensitivity study; 1.5.1. Solving numerical algorithm; 1.6. Numerical example; 1.7. Conclusion; 1.8. Bibliography.
|
505 |
8 |
|
|a CHAPTER 2. JOINT OPTIMIZATION OF MAINTENANCE STRATEGIES ANDINVENTORY CONTROL -- USING THE SIMULATION APPROACH2.1. Introduction; 2.2. Problem description and notations; 2.2.1. Setting; 2.2.2. Definition of the suggested control strategies; 2.2.3. Notation; 2.3. Analytical study and complexity resolution; 2.3.1. Formulation of the cost optimization problem; 2.3.2. Complexity of the optimal control problem; 2.4. Simulation model; 2.4.1. Principle; 2.4.2. Simulation algorithms; 2.5. Optimization and numerical application; 2.5.1. Comparison of ICS and CCS strategies.
|
505 |
8 |
|
|a 2.5.2. Analysis of the effect of the capacity of the final inventory (h)2.5.3. Optimal availability; 2.5.4. Finding the best compromise cost-availability: multicriteria analysis; 2.6. Conclusion; 2.7. Bibliography; CHAPTER 3. JOINT QUALITY CONTROL AND PREVENTIVE MAINTENANCESTRATEGY FOR IMPERFECT PRODUCTION PROCESSES; 3.1. Introduction; 3.2. Problem description and notations; 3.3. Analytical study; 3.3.1. The average inventory cost; 3.3.2. The average maintenance cost; 3.3.3. The average quality cost; 3.4. Optimization; 3.5. Numerical example and sensitivity study; 3.6. Conclusion.
|
505 |
8 |
|
|a 3.7. BibliographyCHAPTER 4. JOINT OPTIMIZATION OF MAINTENANCE STRATEGIES ANDPRODUCTION CONTROL UNDER SUBCONTRACTING CONSTRAINTS; 4.1. Introduction; 4.2. Problem definition; 4.3. The joint use of internal manufacturing and subcontracting to fulfill product demand; 4.3.1. Problem statement; 4.3.2. Notation and data for numerical example; 4.3.3. Simple maintenance policy; 4.3.4. Improved maintenance policy; 4.3.5. Production maintenance policy; 4.3.6. Performance analysis of SMP, IMP and PMP; 4.4. Production control policies under a constraint to perform subcontracting tasks.
|
590 |
|
|
|a ProQuest Ebook Central
|b Ebook Central Academic Complete
|
650 |
|
0 |
|a Computer networks
|x Reliability
|v Congresses.
|
650 |
|
4 |
|a Computer networks
|x Reliability
|v Congresses.
|
650 |
|
6 |
|a Réseaux d'ordinateurs
|x Fiabilité
|v Congrès.
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Industrial Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management Science.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Organizational Behavior.
|2 bisacsh
|
650 |
|
7 |
|a Computer networks
|x Reliability
|2 fast
|
655 |
|
7 |
|a Conference papers and proceedings
|2 fast
|
700 |
1 |
|
|a Dellagi, Sofien.
|
700 |
1 |
|
|a Khatad, Abdelhakim.
|
776 |
0 |
8 |
|i Print version:
|a Rezg, Nidhal.
|t Joint Optimization of Maintenance and Production Policies.
|d Hoboken : Wiley, ©2014
|z 9781848215535
|
830 |
|
0 |
|a FOCUS Series.
|
856 |
4 |
0 |
|u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=1688018
|z Texto completo
|
880 |
0 |
0 |
|6 505-01/(S
|g Machine generated contents note:
|g ch. 1
|t Joint Optimization of Preventive Maintenance and Inventory Control -- Analytical Approach --
|g 1.1.
|t Introduction --
|g 1.2.
|t Description problem and notations --
|g 1.3.
|t Analytical study --
|g 1.3.1.
|t maintenance cost model --
|g 1.3.2.
|t Inventory control cost model --
|g 1.3.3.
|t expression of the average total cost per time unit --
|g 1.4.
|t Optimization --
|g 1.5.
|t Numerical example and sensitivity study --
|g 1.5.1.
|t Solving numerical algorithm --
|g 1.6.
|t Numerical example --
|g 1.7.
|t Conclusion --
|g 1.8.
|t Bibliography --
|g ch. 2
|t Joint Optimization of Maintenance Strategies and Inventory Control -- Using the Simulation Approach --
|g 2.1.
|t Introduction --
|g 2.2.
|t Problem description and notations --
|g 2.2.1.
|t Setting --
|g 2.2.2.
|t Definition of the suggested control strategies --
|g 2.2.3.
|t Notation --
|g 2.3.
|t Analytical study and complexity resolution --
|g 2.3.1.
|t Formulation of the cost optimization problem --
|g 2.3.2.
|t Complexity of the optimal control problem --
|g 2.4.
|t Simulation model --
|g 2.4.1.
|t Principle --
|g 2.4.2.
|t Simulation algorithms --
|g 2.5.
|t Optimization and numerical application --
|g 2.5.1.
|t Comparison of ICS and CCS strategies --
|g 2.5.2.
|t Analysis of the effect of the capacity of the final inventory (h) --
|g 2.5.3.
|t Optimal availability --
|g 2.5.4.
|t Finding the best compromise cost-availability: multicriteria analysis --
|g 2.6.
|t Conclusion --
|g 2.7.
|t Bibliography --
|g ch. 3
|t Joint Quality Control and Preventive Maintenance Strategy for Imperfect Production Processes --
|g 3.1.
|t Introduction --
|g 3.2.
|t Problem description and notations --
|g 3.3.
|t Analytical study --
|g 3.3.1.
|t average inventory cost --
|g 3.3.2.
|t average maintenance cost --
|g 3.3.3.
|t average quality cost --
|g 3.4.
|t Optimization --
|g 3.5.
|t Numerical example and sensitivity study --
|g 3.6.
|t Conclusion --
|g 3.7.
|t Bibliography --
|g ch. 4
|t Joint Optimization of Maintenance Strategies and Production Control under Subcontracting Constraints --
|g 4.1.
|t Introduction --
|g 4.2.
|t Problem definition --
|g 4.3.
|t joint use of internal manufacturing and subcontracting to fulfill product demand --
|g 4.3.1.
|t Problem statement --
|g 4.3.2.
|t Notation and data for numerical example --
|g 4.3.3.
|t Simple maintenance policy --
|g 4.3.4.
|t Improved maintenance policy --
|g 4.3.5.
|t Production maintenance policy --
|g 4.3.6.
|t Performance analysis of SMP, IMP and PMP --
|g 4.4.
|t Production control policies under a constraint to perform subcontracting tasks --
|g 4.4.1.
|t Problem statement --
|g 4.4.2.
|t Simple maintenance policy --
|g 4.4.3.
|t Integrated maintenance policy --
|g 4.4.4.
|t Performance analysis of InMP and SMP --
|g 4.5.
|t Conclusion --
|g 4.6.
|t Appendix 1: simulation model of IMP --
|g 4.7.
|t Appendix 2: simulation model of SiMP --
|g 4.8.
|t Bibliography --
|g ch. 5
|t Joint Optimization Service and Maintenance Policies under Environmental Constraints --
|g 5.1.
|t Introduction --
|g 5.2.
|t Literature review --
|g 5.3.
|t Problem description and notations --
|g 5.4.
|t Analytical study --
|g 5.5.
|t Optimization --
|g 5.6.
|t Numerical example and sensitivity study --
|g 5.6.1.
|t Experiment 1: impact of Cd on (E(Ct)/E(Tc)) and δ --
|g 5.6.2.
|t Experiment 2: impact of H on (E(Ct)/E(Tc)) and δ --
|g 5.7.
|t Conclusion --
|g 5.8.
|t Appendix --
|g 5.8.1.
|t Proof of proposition 5.2 --
|g 5.8.2.
|t Proof of proposition 5.3 --
|g 5.8.3.
|t Proof of proposition 5.4 --
|g 5.9.
|t Bibliography.
|
938 |
|
|
|a ProQuest Ebook Central
|b EBLB
|n EBL1688018
|
938 |
|
|
|a ebrary
|b EBRY
|n ebr10870251
|
938 |
|
|
|a EBSCOhost
|b EBSC
|n 778149
|
938 |
|
|
|a ProQuest MyiLibrary Digital eBook Collection
|b IDEB
|n cis28351248
|
938 |
|
|
|a YBP Library Services
|b YANK
|n 11810839
|
938 |
|
|
|a YBP Library Services
|b YANK
|n 11072233
|
938 |
|
|
|a YBP Library Services
|b YANK
|n 12673055
|
994 |
|
|
|a 92
|b IZTAP
|