Cargando…

An introduction to cut-off grade estimation /

An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Profitability and socioeconomic impact of mining operations are influenced by the choic...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Rendu, Jean-Michel, 1944- (Autor)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Englewood, CO : Published by Society for Mining, Metallurgy, and Exploration, Inc., 2014.
Edición:Second edition.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBOOKCENTRAL_ocn867050572
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cnu---unuuu
008 140102s2014 cou ob 001 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d OCLCF  |d YDXCP  |d EBLCP  |d DEBSZ  |d OCLCQ  |d K6U  |d OCLCQ  |d JBG  |d COCUF  |d OCLCQ  |d PIFFA  |d FVL  |d ZCU  |d MERUC  |d OCLCQ  |d U3W  |d STF  |d VTS  |d ICG  |d INT  |d VT2  |d OCLCQ  |d WYU  |d TKN  |d OCLCQ  |d DKC  |d AU@  |d OCLCQ  |d M8D  |d OCLCQ  |d OCLCO  |d OCLCQ  |d QGK  |d OCLCO  |d OCLCL 
019 |a 867926397  |a 961695207  |a 962721712  |a 1055380870  |a 1066451380  |a 1081267227  |a 1228545658  |a 1259188872 
020 |a 9780873353946  |q (electronic bk.) 
020 |a 0873353943  |q (electronic bk.) 
020 |z 9780873353939 
020 |z 0873353935 
029 1 |a DEBBG  |b BV043031124 
029 1 |a DEBBG  |b BV044065812 
029 1 |a DEBSZ  |b 429950756 
029 1 |a DEBSZ  |b 431594252 
029 1 |a GBVCP  |b 800273516 
035 |a (OCoLC)867050572  |z (OCoLC)867926397  |z (OCoLC)961695207  |z (OCoLC)962721712  |z (OCoLC)1055380870  |z (OCoLC)1066451380  |z (OCoLC)1081267227  |z (OCoLC)1228545658  |z (OCoLC)1259188872 
050 4 |a TN560  |b .R45 2014eb 
072 7 |a TEC  |x 026000  |2 bisacsh 
082 0 4 |a 622/.7  |2 23 
049 |a UAMI 
100 1 |a Rendu, Jean-Michel,  |d 1944-  |e author.  |1 https://id.oclc.org/worldcat/entity/E39PCjJjwPYYFGMMBRXPv7hrFX 
245 1 3 |a An introduction to cut-off grade estimation /  |c by Jean-Michel Rendu. 
250 |a Second edition. 
264 1 |a Englewood, CO :  |b Published by Society for Mining, Metallurgy, and Exploration, Inc.,  |c 2014. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
588 0 |a Print version record. 
505 0 |a Cover; Title Page; Copyright; Contents; Preface to 2014 Edition; Preface to 2008 Edition; Chapter 1: INTRODUCTION; Chapter 2:GENERAL CONCEPTS; Mathematical Formulation: UtilityFunction; Cut-off Grade and Grade-Tonnage Relationship; Direct Profit and Loss: Udir(x); Net Present Value: NPVi; Opportunity Costs and Benefits: Uopp(x); Other Costs and Benefits: Uoth(x); Cut-off Grade and Blending Strategy; Chapter 3:BREAKEVEN CUT-OFF GRADE; Cut-off Grade Between Ore and Waste; Cut-off Grades in Open Pit Mines; Cut-off Grades in Underground Mines; Cut-off Grade Between Two Processes. 
505 8 |a Cut-off Grade with Variable RecoveryConstant Tail Model of Variable Recovery; Breakeven Cut-off Grade and Polymetallic Deposits; OpportunityCost of Not Using the Optimum Cut-off Grade; Cut-off Grade and Low-Grade Stockpiles; Cut-off Grade and Optimization of Processing Plant Operating Conditions; Chapter 4:CAPACITY CONSTRAINTS AND OPPORTUNITY COSTS; WhenMarginal Analysis No Longer Applies: A Gold Leaching Operation; Capacity Constraints and Increase in Cut-off Grade; DecreasingCut-off Grade over Time: A Strategic Objective; Cut-off Grade Below Marginal Cut-off Grade. 
505 8 |a Cut-offGrade Optimization with Opportunity Costs: Practical ConsiderationsChapter 5:GEOLOGIC CONSTRAINTS AND OPPORTUNITY COSTS; Cut-off Grade When Processing Capacity Is Fixed; Cut-off Grade When Mining Capacity Is Fixed; Cut-off Grade When Volume of Sales Is Fixed; Releasing Capacity Constraints: A Base Metal Example; Chapter 6:CUT-OFF GRADE AND MINE PLANNING; Open Pit Mine: Economic Valuation of a Pushback; Underground Mine: Economic Valuation of a Stope; Similarities BetweenOpen Pit and Underground Mine Planning; Block and Panel Caving. 
505 8 |a Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off GradeChapter 7:WHICH COSTS SHOULD BE INCLUDED IN CUT-OFF GRADE CALCULATIONS?; General Considerations; HowSpecific Costs Influence Cut-off Grade Calculations; Other Costs and Benefits; Chapter 8:BLENDING STRATEGY; Blending Two Material Types; Blending Three Material Types; Blending to Maximize Tonnage; RemarksConcerning an Increasingly Complex Blending Problem; Chapter 9:CLOSING REMARKS; APPENDIX A; Example 1. Net Present Value of Constant Cash Flow: Proofof Formula. 
505 8 |a Example 2.Net Present Value of Perpetuity Cash Flow: Proof of FormulaExample 3. Opportunity Cost of Mining a Peripheral Deposit; Example 4. Simplified Equation to Estimate Opportunity Cost: Verification of First-Order Approximation; Example5. Opportunity Cost of Not Using the Optimal Cut-off Grade in a Copper Mine; Example 6. Stockpilingand Cut-off Determination in a Copper Mine; Example7. Properties of Constant-Metric-Tons Curves in Blending Diagrams; LIST OF SYMBOLS; BIBLIOGRAPHY; INDEX; ABOUT THE AUTHOR; Back Cover. 
520 |a An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Profitability and socioeconomic impact of mining operations are influenced by the choice of cut-off grades. Cut-off grades play a key role in estimating mineral reserves that can be publicly reported. 
546 |a English. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
590 |a eBooks on EBSCOhost  |b EBSCO eBook Subscription Academic Collection - Worldwide 
650 0 |a Ores  |x Grading. 
650 0 |a Ores  |x Sampling and estimation. 
650 6 |a Minerais  |x Classement. 
650 6 |a Minerais  |x Échantillonnage et estimation. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Mining.  |2 bisacsh 
650 7 |a Ores  |x Grading  |2 fast 
650 7 |a Ores  |x Sampling and estimation  |2 fast 
758 |i has work:  |a An introduction to cut-off grade estimation (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGpJM9JW3gxdMrfT8FrgJC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Rendu, Jean-Michel, 1944-  |t Introduction to cut-off grade estimation.  |b Second edition  |z 9780873353939  |w (DLC) 2013043932  |w (OCoLC)863044201 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=1584848  |z Texto completo 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL1584848 
938 |a EBSCOhost  |b EBSC  |n 681401 
938 |a YBP Library Services  |b YANK  |n 11526479 
994 |a 92  |b IZTAP