Cargando…

Cost Management of Construction Projects.

The cost manager/quantity surveyor plays a pivotal role in the financial and contract management of construction projects, although the exact nature of the service they provide depends on the project employer's terms of engagement. This can mean acting as consultant in a range of roles includin...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Towey, Donald
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Hoboken : Wiley, 2013.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Mu 4500
001 EBOOKCENTRAL_ocn851315856
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |n|||||||||
008 130629s2013 xx o 000 0 eng d
040 |a EBLCP  |b eng  |e pn  |c EBLCP  |d OCLCQ  |d YDXCP  |d Z5A  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCF  |d DEBSZ  |d OCLCO  |d OCLCQ  |d OCLCO  |d CNNOR  |d CPO  |d MOR  |d PIFPO  |d ZCU  |d MERUC  |d OCLCQ  |d U3W  |d STF  |d WRM  |d NRAMU  |d INT  |d OCLCQ  |d G3B  |d TKN  |d OCLCQ  |d DKC  |d OCLCQ  |d HS0  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
020 |a 9781118473795 
020 |a 1118473795 
029 1 |a DEBSZ  |b 431439079 
029 1 |a NZ1  |b 15550092 
029 1 |a AU@  |b 000069136714 
035 |a (OCoLC)851315856 
050 4 |a TH438.15 .T69 2013 
070 |a TH438.15  |b .T69 2013eb 
082 0 4 |a 624.068/1  |a 624.0681 
084 |a TEC054000  |2 bisacsh 
049 |a UAMI 
100 1 |a Towey, Donald. 
245 1 0 |a Cost Management of Construction Projects. 
260 |a Hoboken :  |b Wiley,  |c 2013. 
300 |a 1 online resource (331 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
505 0 |a Cost Management of Construction Projects; Copyright; Contents; Preface; 1 Practice Procedures; 1.1 Organisation and structure; 1.1.2 Marketing and regulating; 1.2 Methods of appointment; 1.2.1 Client engagement; 1.2.2 Contracts of services; 1.2.3 Contracts of service; 1.3 Business development; 1.3.1 New business and cold calling; 2 RICS New Rules of Measurement (NRM); 2.1 What is NRM?; 2.1.1 Status of NRM; 2.2 RICS NRM2: Detailed measurement for building works; 2.2.1 Usage; 2.2.2 Structure; 2.2.3 Information required for BQ preparation; 2.2.4 Tabulated works sections and rules. 
505 8 |a 2.2.5 Measurement rules for building components/items2.3 Taking off; 2.3.1 Measurement example -- Substructure; 2.3.2 Measurement example -- Superstructure walls; 2.4 Bill of quantities (BQ); 2.4.1 Composition; 2.4.2 Breakdown structure; 2.4.3 Cost centres; 2.4.4 Bills of addendum and reduction; 2.4.5 Software and BQ production; 3 Pre-contract Cost Management; 3.1 Cost planning; 3.2 Plans of work; 3.3 Development; 3.4 Design influence on cost; 3.4.1 Time, cost and quality relationships; 3.4.2 Redundant performance and circulation areas; 3.4.3 Building height; 3.4.4 Modulation. 
505 8 |a 3.4.5 Building shape3.4.6 Buildability; 3.4.7 Environmentally friendly buildings; 3.4.8 Life-cycle costs; 3.5 Setting a budget; 3.5.1 Client preparation; 3.5.2 Estimating techniques for the feasibility study; 3.5.3 Estimate techniques for setting the budget; 3.6 Early design development; 3.6.1 Creating cost targets; 3.6.2 Element measuring; 3.6.3 Element rate costing; 3.7 Ongoing design development; 3.8 Self-checking of design development; 3.9 Action on variances; 3.9.1 Value management; 3.10 Final design proposals and production information; 3.11 Cost planning accuracy; 4 Procurement Systems. 
505 8 |a 4.1 Procurement definition4.2 Meeting the client's objectives; 4.3 Influencing reports and the need for change; 4.3.1 The Banwell Report; 4.3.2 Constructing the Team (Latham); 4.3.3 Rethinking Construction (Egan); 4.3.4 Achieving Excellence in Construction (OGC); 4.3.5 Modernising Construction (NAO); 4.3.6 Strategies for Sustainable Construction (Government); 4.3.7 Never Waste a Good Crisis (Wolstenholme); 4.4 Procurement routes; 4.4.1 The client's brief and influence on procurement routes; 4.4.2 Traditional pathways; 4.4.3 Design and build; 4.4.4 Construction management schemes. 
505 8 |a 4.4.5 Private Finance Initiative (PFI)4.4.6 Public Private Partnership (PPP); 4.4.7 Prime contracting; 4.4.8 Partnering and strategic alliances; 4.4.9 Project alliances; 4.4.10 Framework arrangements; 4.4.11 Public procurement and European legislation; 4.5 Appropriate procurement selection; 4.5.1 Risk analysis; 4.5.2 Risk management; 4.5.3 Health and safety management; 4.5.4 Consultant selection; 4.5.5 Contractor selection; 4.5.6 Pre-qualification Questionnaire (PQQ); 4.5.7 Invitation to Tender (ITT) and the tender period; 4.5.8 Tender assessment; 4.5.9 Due diligence; 5 Construction Contracts. 
500 |a 5.1 Freedom of contract and contract law. 
520 |a The cost manager/quantity surveyor plays a pivotal role in the financial and contract management of construction projects, although the exact nature of the service they provide depends on the project employer's terms of engagement. This can mean acting as consultant in a range of roles including cost and advisory services for budget setting to initiate a project, cost management through the design and construction phases, contract administration and acting as the client side project manager to oversee the entire building process. Cost Management of Construction Projects focusse. 
588 0 |a Print version record. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Building  |x Cost control. 
650 0 |a Building  |x Estimates  |x Auditing. 
650 6 |a Construction  |x Devis estimatifs  |x Audit. 
650 7 |a Building  |x Cost control  |2 fast 
758 |i has work:  |a Cost Management of Construction Projects [electronic resource] (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCXC7rgGkfTJHycTmjr3QyH  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Towey, Donald.  |t Cost Management of Construction Projects.  |d Hoboken : Wiley, ©2013  |z 9781118473771 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=1211623  |z Texto completo 
938 |a EBL - Ebook Library  |b EBLB  |n EBL1211623 
938 |a YBP Library Services  |b YANK  |n 10753959 
994 |a 92  |b IZTAP