Cargando…

Financial management information systems : 25 years of World Bank experience on what works and what doesn't /

Since 1984, the World Bank has financed 87 Financial Management Information System (FMIS) projects in 51 countries totaling over US

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Dener, Cem
Otros Autores: Watkins, Joanna Alexandra, Dorotinsky, William Leslie
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Washington, D.C. : World Bank, ©2011.
Colección:World Bank study.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 a 4500
001 EBOOKCENTRAL_ocn733547028
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cnu---unuuu
008 110629s2011 dcuab ob 000 0 eng d
010 |a  2011282675 
040 |a N$T  |b eng  |e pn  |c N$T  |d YDXCP  |d E7B  |d OCLCQ  |d CDX  |d NUI  |d COO  |d OCLCQ  |d DEBSZ  |d OCLCQ  |d OCLCO  |d BWS  |d MHW  |d IDEBK  |d MEAUC  |d DHA  |d OCLCQ  |d WAU  |d OCLCQ  |d OCLCF  |d COCUF  |d MOR  |d PIFAG  |d DCWBL  |d OCLCQ  |d ZCU  |d OCLCQ  |d MERUC  |d OCLCQ  |d U3W  |d CAUOI  |d OCL  |d CEF  |d ICG  |d INT  |d OCLCQ  |d WYU  |d VT2  |d OCLCQ  |d DKC  |d OCLCQ  |d YOU  |d VLY  |d OCLCQ  |d OCLCO  |d UKCRE  |d OCLCO  |d OCLCQ  |d SFB  |d INARC  |d OCLCO  |d OCLCL 
019 |a 732957603  |a 743412141  |a 811493571  |a 813533340  |a 816840240  |a 821636398  |a 895047077  |a 961508818  |a 962575307  |a 988520738  |a 991962255  |a 992394503  |a 993891261  |a 1029496935  |a 1037944363  |a 1063955994  |a 1077238091  |a 1081270562  |a 1088959945  |a 1120885821  |a 1153041699  |a 1162319979  |a 1290079727  |a 1300794255  |a 1377820589  |a 1391531106  |a 1396711351 
020 |a 9780821387535  |q (electronic bk.) 
020 |a 0821387537  |q (electronic bk.) 
020 |a 0821387502 
020 |a 9780821387504 
020 |a 6613100137 
020 |a 9786613100139 
020 |a 1283100134 
020 |a 9781283100137 
020 |z 9780821387504 
020 |z 0821387502 
029 1 |a AU@  |b 000049071322 
029 1 |a AU@  |b 000052898788 
029 1 |a CHNEW  |b 000599347 
029 1 |a DEBBG  |b BV044154338 
029 1 |a DEBSZ  |b 372695639 
029 1 |a DEBSZ  |b 396992889 
029 1 |a HEBIS  |b 299824896 
029 1 |a NZ1  |b 14221033 
035 |a (OCoLC)733547028  |z (OCoLC)732957603  |z (OCoLC)743412141  |z (OCoLC)811493571  |z (OCoLC)813533340  |z (OCoLC)816840240  |z (OCoLC)821636398  |z (OCoLC)895047077  |z (OCoLC)961508818  |z (OCoLC)962575307  |z (OCoLC)988520738  |z (OCoLC)991962255  |z (OCoLC)992394503  |z (OCoLC)993891261  |z (OCoLC)1029496935  |z (OCoLC)1037944363  |z (OCoLC)1063955994  |z (OCoLC)1077238091  |z (OCoLC)1081270562  |z (OCoLC)1088959945  |z (OCoLC)1120885821  |z (OCoLC)1153041699  |z (OCoLC)1162319979  |z (OCoLC)1290079727  |z (OCoLC)1300794255  |z (OCoLC)1377820589  |z (OCoLC)1391531106  |z (OCoLC)1396711351 
050 4 |a HJ9745  |b .D46 2011eb 
072 7 |a BUS  |x 001020  |2 bisacsh 
082 0 4 |a 657/.835  |2 23 
049 |a UAMI 
100 1 |a Dener, Cem. 
245 1 0 |a Financial management information systems :  |b 25 years of World Bank experience on what works and what doesn't /  |c [Cem Dener, Joanna Alexandra Watkins, William Leslie Dorotinsky]. 
260 |a Washington, D.C. :  |b World Bank,  |c ©2011. 
300 |a 1 online resource (xix, 153 pages) :  |b color illustrations, color maps 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a data file  |2 rda 
380 |a Bibliography 
490 1 |a World Bank study 
504 |a Includes bibliographical references (pages 85-86). 
588 0 |a Print version record. 
520 |a Since 1984, the World Bank has financed 87 Financial Management Information System (FMIS) projects in 51 countries totaling over US  |2 .2 billion, of which US 
505 0 |a Abbreviations; Acknowledgments; Preface; Executive Summary; 1. Introduction; Figures; Figure 1.1. A Modular Approach for Building FMIS; Definitions; Methodology; Tables; Table 1.1. Coding of FMIS Project Components; 2. Descriptive Data Analysis; Duration; Figure 2.1. Total Duration of Completed Projects; Figure 2.2. Preparation Period in Completed+Active Projects; Regional Distribution; Figure 2.3. Effectiveness Period in Completed+Active Projects; Figure 2.4. Extension Period in Completed Projects; Project Characteristics; Figure 2.5. Regional Distribution of Completed Projects. 
505 8 |a Figure 2.6. Regional Distribution of Completed+Active ProjectsFigure 2.7. Type of Completed and Active FMIS Projects; Figure 2.8. FMIS as Core Activity in Completed and Active Projects; Objectives; Scope; Figure 2.9. Treasury vs. FMIS Focus in Completed and Active Projects; Project Funding; Figure 2.10. Scope of FMIS in Completed and Active Projects; Table 2.1. Funding and ICT Costs of FMIS Projects; Table 2.2. Regional Distribution of Completed FMIS Project Funding and ICT Costs; Lending Instruments; Figure 2.11. Lending Instruments in FMIS Projects; Cost of FMIS ICT Solutions. 
505 8 |a Figure 2.12. Cost of FMIS ICT SolutionsFigure 2.13. Actual vs. Estimated Costs of FMIS Projects; Figure 2.14. Trend Lines for COTS and LDSW Solutions in FMIS Projects; Information and Communication Technology Solutions; Figure 2.15. FMIS ICT Cost per User for COTS and LDSW Solutions; Figure 2.16. Application Software Solutions in FMIS Projects; Procurement Packages and Contracts Signed; Table 2.3. Regional Distribution of the Type of T/F ASW Solutions; Figure 2.17. The Number of Procurement Packages Processed in Completed Projects. 
505 8 |a Figure 2.18. The Number of Contracts Signed in Completed ProjectsImplementation Resources; Figure 2.19. Distribution of Staff Weeks Devoted to Completed Projects; Disbursement Rates; Figure 2.20. Distribution of the Total Bank Budget Allocated to Completed Projects; Figure 2.21. The Bank Budget/Year Allocated to Completed Projects; Figure 2.22. Typical Disbursement Profile of FMIS Projects; Table 2.4. Regional Variations in Restructuring and Extension of Completed Projects; Regional Variation in Design and Implementation; Table 2.5. Regional Variation of FMIS Implementation Approach. 
505 8 |a 3. Project PerformanceICR Ratings; Table 3.1. Definitions of ICR Ratings; IEG Ratings; Figure 3.1. Regional Distribution of ICR Project Outcome Ratings; Figure 3.2. Regional Distribution of ICR Development Impact Ratings; Figure 3.3. Regional Distribution of IEG Project Outcome Ratings; Operational Status; Figure 3.4. Regional Distribution of IEG Development Impact Ratings; Preparation Approaches; Figure 3.5. Operational Status of Treasury/FMIS Projects; Table 3.2. FMIS Project Preparation Approach in 55 Completed Projects; Success Factors. 
546 |a English. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Finance, Public  |x Management  |x Data processing. 
650 0 |a Management information systems. 
650 2 |a Management Information Systems 
650 6 |a Finances publiques  |x Gestion  |x Informatique. 
650 6 |a Systèmes d'information de gestion. 
650 7 |a BUSINESS & ECONOMICS  |x Accounting  |x Governmental.  |2 bisacsh 
650 7 |a Management information systems  |2 fast 
700 1 |a Watkins, Joanna Alexandra. 
700 1 |a Dorotinsky, William Leslie. 
758 |i has work:  |a Financial management information systems (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGYtJrQHghd6xvrjcjQ3w3  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |t Financial Management Information Systems.  |d World Bank 2011  |z 9780821387504  |w (OCoLC)714721106 
830 0 |a World Bank study. 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=692792  |z Texto completo 
938 |a Coutts Information Services  |b COUT  |n 17897640 
938 |a ebrary  |b EBRY  |n ebr10468650 
938 |a EBSCOhost  |b EBSC  |n 366676 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n 310013 
938 |a YBP Library Services  |b YANK  |n 5123375 
938 |a Internet Archive  |b INAR  |n financialmanagem0000dene 
994 |a 92  |b IZTAP