Introduction to Cut-off Grade Estimation.
An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial return...
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Littleton :
SME,
2008.
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation.
- CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio.