|
|
|
|
LEADER |
00000cam a2200000Mu 4500 |
001 |
EBOOKCENTRAL_ocn609846004 |
003 |
OCoLC |
005 |
20240329122006.0 |
006 |
m o d |
007 |
cr n||---||||| |
008 |
100427s2008 xx o 000 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d MERUC
|d OCLCQ
|d N$T
|d OCLCQ
|d OCLCF
|d OCLCQ
|d DEBSZ
|d OCLCQ
|d ZCU
|d VTS
|d ICG
|d OCLCQ
|d STF
|d DKC
|d OCLCQ
|d M8D
|d OCLCQ
|d K6U
|d OCLCO
|d OCLCQ
|d OCLCO
|d OCLCL
|
019 |
|
|
|a 535997865
|a 1087364204
|a 1264725348
|a 1297185755
|a 1297475375
|
020 |
|
|
|a 9780873352840
|q (electronic bk.)
|
020 |
|
|
|a 087335284X
|q (electronic bk.)
|
029 |
1 |
|
|a AU@
|b 000053292618
|
029 |
1 |
|
|a DEBBG
|b BV043155612
|
029 |
1 |
|
|a DEBBG
|b BV044138917
|
029 |
1 |
|
|a DEBSZ
|b 421441577
|
029 |
1 |
|
|a DEBSZ
|b 430770936
|
035 |
|
|
|a (OCoLC)609846004
|z (OCoLC)535997865
|z (OCoLC)1087364204
|z (OCoLC)1264725348
|z (OCoLC)1297185755
|z (OCoLC)1297475375
|
050 |
|
4 |
|a TN560
|
072 |
|
7 |
|a TEC
|x 026000
|2 bisacsh
|
082 |
0 |
4 |
|a 622.7
|
049 |
|
|
|a UAMI
|
100 |
1 |
|
|a Rendu, Jean-Michel.
|
245 |
1 |
0 |
|a Introduction to Cut-off Grade Estimation.
|
260 |
|
|
|a Littleton :
|b SME,
|c 2008.
|
300 |
|
|
|a 1 online resource (115 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
505 |
0 |
|
|a Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation.
|
505 |
8 |
|
|a CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio.
|
520 |
|
|
|a An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr.
|
588 |
0 |
|
|a Print version record.
|
590 |
|
|
|a eBooks on EBSCOhost
|b EBSCO eBook Subscription Academic Collection - Worldwide
|
590 |
|
|
|a ProQuest Ebook Central
|b Ebook Central Academic Complete
|
650 |
|
0 |
|a Ores
|x Grading.
|
650 |
|
0 |
|a Ores
|x Sampling and estimation.
|
650 |
|
6 |
|a Minerais
|x Classement.
|
650 |
|
6 |
|a Minerais
|x Échantillonnage et estimation.
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Mining.
|2 bisacsh
|
650 |
|
7 |
|a Ores
|x Grading
|2 fast
|
650 |
|
7 |
|a Ores
|x Sampling and estimation
|2 fast
|
758 |
|
|
|i has work:
|a An introduction to cut-off grade estimation (Text)
|1 https://id.oclc.org/worldcat/entity/E39PCGpJM9JW3gxdMrfT8FrgJC
|4 https://id.oclc.org/worldcat/ontology/hasWork
|
776 |
0 |
8 |
|i Print version:
|z 9780873352680
|
856 |
4 |
0 |
|u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=464596
|z Texto completo
|
938 |
|
|
|a EBL - Ebook Library
|b EBLB
|n EBL464596
|
938 |
|
|
|a EBSCOhost
|b EBSC
|n 439082
|
994 |
|
|
|a 92
|b IZTAP
|