Cargando…

Avoiding claims in building design : risk management in practice /

The chance of being claimed against is now a major risk factor for every building designer, quantity surveyor and project manager. Quite apart from the many cases which go to court, many other claims are settled before they reach the courts. The cost of insurance to meet claims is now a substantial...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Taylor, Malcolm
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Oxford, UK ; Malden, MA : Blackwell Science, 2000.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 EBOOKCENTRAL_ocn608622811
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cn|||||||||
008 991123s2000 enka o 001 0 eng d
040 |a MERUC  |b eng  |e pn  |c MERUC  |d E7B  |d OCLCQ  |d TEFOD  |d BTCTA  |d IDEBK  |d EBLCP  |d OCLCO  |d DG1  |d OCLCQ  |d OCLCF  |d OCLCQ  |d AU@  |d OCLCO  |d YDXCP  |d CNNAI  |d DEBSZ  |d OCLCO  |d TEFOD  |d OCLCQ  |d OCLCO  |d COO  |d OCLCO  |d OCLCQ  |d OCLCO  |d DEBBG  |d AZK  |d CNNOR  |d DG1  |d LIP  |d PIFAG  |d ZCU  |d OCLCQ  |d MERUC  |d OCLCQ  |d U3W  |d BUF  |d OCLCQ  |d BRL  |d STF  |d WRM  |d NRAMU  |d ICG  |d INT  |d VT2  |d OCLCQ  |d A6Q  |d OCLCQ  |d DKC  |d OCLCQ  |d OL$  |d UHL  |d OCLCQ  |d U@J  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 214281377  |a 298440589  |a 646752077  |a 704761329  |a 746573033  |a 842266275  |a 858436682  |a 961541861  |a 962613438  |a 992108064  |a 992906981  |a 1037478416  |a 1038690170  |a 1045493928  |a 1055353464  |a 1058066914  |a 1076306748  |a 1081219916  |a 1112930343 
020 |a 9780470680148  |q (electronic bk. ;  |q Adobe Reader) 
020 |a 0470680148  |q (electronic bk. ;  |q Adobe Reader) 
020 |a 9780470690413 
020 |a 0470690410 
020 |z 9780632053261 
020 |z 0632053267  |q (pbk.) 
024 7 |a 10.1002/9780470690413  |2 doi 
029 1 |a AU@  |b 000050894975 
029 1 |a AU@  |b 000053010319 
029 1 |a CHBIS  |b 010880167 
029 1 |a CHNEW  |b 000935304 
029 1 |a CHVBK  |b 480156484 
029 1 |a DEBBG  |b BV043391135 
029 1 |a DEBBG  |b BV044129996 
029 1 |a DEBSZ  |b 430492545 
029 1 |a DEBSZ  |b 484982524 
029 1 |a HEBIS  |b 231656378 
029 1 |a NZ1  |b 13340703 
035 |a (OCoLC)608622811  |z (OCoLC)214281377  |z (OCoLC)298440589  |z (OCoLC)646752077  |z (OCoLC)704761329  |z (OCoLC)746573033  |z (OCoLC)842266275  |z (OCoLC)858436682  |z (OCoLC)961541861  |z (OCoLC)962613438  |z (OCoLC)992108064  |z (OCoLC)992906981  |z (OCoLC)1037478416  |z (OCoLC)1038690170  |z (OCoLC)1045493928  |z (OCoLC)1055353464  |z (OCoLC)1058066914  |z (OCoLC)1076306748  |z (OCoLC)1081219916  |z (OCoLC)1112930343 
037 |b OverDrive, Inc.  |n http://www.overdrive.com 
037 |a 066B2314-A952-4D2C-8897-8647FFF1FC4C  |b OverDrive, Inc.  |n http://www.overdrive.com 
050 4 |a TH438  |b .T39 2000eb 
072 7 |a KNJ  |2 bicssc 
082 0 4 |a 692/.8  |2 22 
049 |a UAMI 
100 1 |a Taylor, Malcolm. 
245 1 0 |a Avoiding claims in building design :  |b risk management in practice /  |c Malcolm Taylor. 
260 |a Oxford, UK ;  |a Malden, MA :  |b Blackwell Science,  |c 2000. 
300 |a 1 online resource (xv, 288 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a data file  |2 rda 
588 0 |a Print version record. 
505 0 |a Cover -- TOC36;Contents -- Preface -- Acknowledgements -- Glossary of Terms -- Introduction -- For whom is this book written63; -- Some terms of reference -- Why do practices need to manage risk63; -- Changes in society39;s perception of the professional -- Does insurance affect the frequency of claims63; -- Professionals need the weapons to fight back -- Claims 45; failure of management or design63; -- The structure of this book -- Part One58; Principles and Practice of Risk Management -- CH36;146; Defining and identifying risk -- Definitions -- Identifying risk -- Conscious risk strategy -- Identifying and ranking the risks in your own practice -- CH36;246; The Risk Anatomy of Practice -- Introduction -- Innovatory or cautious design63; -- Innovation and the young practice -- Young44; mature and older practices -- The commercial elements of practice -- Do you produce house style design63; -- Separation of design from production documentation -- Balancing of resources and skills -- Qualification and experience -- How dispersed is your practice63; -- Delegation -- Financial controls -- Markets and marketing -- Hierarchy and succession -- Summary -- CH36;346; A View of the Professions58; their Individual Risk Patterns -- Introduction -- The architect as lead consultant and designer -- The interior designer -- The landscape architect -- The planner -- Civil and structural engineers -- The services engineers -- The quantity surveyor -- The project manager -- CH36;446; The Boundaries of Risk Between the Professions -- Introduction -- Boundaries of responsibility -- Joint ventures -- Subconsulting -- Additional risks for multidiscipline practices -- Cooperation in times of trouble -- CH36;546; Risk Management and Quality Assurance Compared -- Is quality assurance relevant to risk management63; -- Definitions -- The rules of QA -- How does QA work63; -- Why do firms need QA63; -- QA and risk management compared -- Relevance of QA to risk management -- CH36;646; The Practitioner and his Insurers -- Professional indemnity insurance -- Mutuals and the Wren Insurance Association -- CH36;746; Introducing Risk Management into the Office -- Introduction -- A model framework for all practices63; -- The components of a risk management system -- Costing the process -- Setting up the system -- Applying the system -- Maintaining the system -- Part Two58; The Processes of Risk Management -- CH36;846; Setting Up the Appointment -- Introduction -- The start of the process -- Preparing the ground for the appointment -- Anatomy of the appointment -- Preparing the appointment -- The institutes39; standard forms of engagement -- Completing the forms -- CH36;946; Standard Forms of Engagement58; The Architect -- Which form should be used63; -- Coordinating the scope of services with others -- Coordinating whole team design -- The architect39;s design duties -- Conditions of appointment -- CH36;1046; Standard Forms of Engagement58; Engineers44; Quantity Surveyor44; National Health Service and Project Manager -- The Engineers -- Coordination -- The services -- Builder39;s work 40;ACE47;B241; -- Cost reporting 40;ACE. 
520 |a The chance of being claimed against is now a major risk factor for every building designer, quantity surveyor and project manager. Quite apart from the many cases which go to court, many other claims are settled before they reach the courts. The cost of insurance to meet claims is now a substantial component of every practice's overheads. Sensible risk management can identify the potential sources of claims, reduce their likelihood, warn the practice of impending trouble and control how the claim is to be defended. This book sets out how to plan a risk management strategy and suggests techniques which can supplement the practice's existing management procedures without imposing unnecessary bureaucracy. It attaches as much importance to the interaction of risk between members of the design team as the risk profile of the practice itself. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Building  |x Superintendence. 
650 0 |a Building  |x Planning. 
650 0 |a Risk assessment. 
650 0 |a Building  |x Quality control. 
650 0 |a Construction contracts. 
650 2 |a Risk Assessment 
650 6 |a Construction  |x Direction des travaux. 
650 6 |a Construction  |x Planification. 
650 6 |a Évaluation du risque. 
650 6 |a Construction  |x Qualité  |x Contrôle. 
650 7 |a risk assessment.  |2 aat 
650 7 |a Building  |x Planning  |2 fast 
650 7 |a Building  |x Quality control  |2 fast 
650 7 |a Building  |x Superintendence  |2 fast 
650 7 |a Construction contracts  |2 fast 
650 7 |a Risk assessment  |2 fast 
758 |i has work:  |a Avoiding claims in building design (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCG63f8Mtpdhtrt3bvGY4HK  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Taylor, Malcolm.  |t Avoiding claims in building design.  |d Oxford, UK ; Malden, MA : Blackwell Science, 2000  |w (DLC) 99059647 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=350955  |z Texto completo 
938 |a Baker and Taylor  |b BTCP  |n BK0008165773 
938 |a EBL - Ebook Library  |b EBLB  |n EBL350955 
938 |a ebrary  |b EBRY  |n ebr10233085 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n 131839 
938 |a YBP Library Services  |b YANK  |n 2861912 
938 |a YBP Library Services  |b YANK  |n 2940776 
994 |a 92  |b IZTAP