Cargando…

End-to-end scheduling with Tivoli Workload Scheduler 8.1 /

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor Corporativo: International Business Machines Corporation. International Technical Support Organization
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Austin, Tex. : IBM Corp., International Technical Support Organization, 2002.
Edición:1st ed.
Colección:IBM redbooks.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Front cover
  • Contents
  • Figures
  • Tables
  • Notices
  • Trademarks
  • Preface
  • The team that wrote this redbook
  • Notice
  • Comments welcome
  • Chapter 1. Introduction
  • 1.1 Job scheduling
  • 1.2 Introduction to Tivoli Workload Scheduler for z/OS
  • 1.2.1 Overview of Tivoli Workload Scheduler for z/OS
  • 1.2.2 Tivoli Workload Scheduler for z/OS architecture
  • 1.3 Introduction to Tivoli Workload Scheduler
  • 1.3.1 Overview of Tivoli Workload Scheduler
  • 1.3.2 Tivoli Workload Scheduler architecture
  • 1.4 Benefits of integrating TWS for z/OS and TWS1.5 Summary of enhancements in Tivoli Workload Scheduler 8.1
  • 1.5.1 Enhancements to Tivoli Workload Scheduler for z/OS
  • 1.5.2 Enhancements to Tivoli Workload Scheduler
  • 1.5.3 Enhancements to the Job Scheduling Console
  • 1.6 The terminology used in this book
  • 1.7 Material covered in this book
  • Chapter 2. End-to-end TWS architecture and components
  • 2.1 Tivoli Workload Scheduler architecture
  • 2.1.1 The Tivoli Workload Scheduler network
  • 2.1.2 Tivoli Workload Scheduler workstation types
  • 2.1.3 Tivoli Workload Scheduler topology2.1.4 Tivoli Workload Scheduler components
  • 2.1.5 Tivoli Workload Scheduler database objects
  • 2.1.6 Tivoli Workload Scheduler plan
  • 2.1.7 Other Tivoli Workload Scheduler features
  • 2.1.8 Making the Tivoli Workload Scheduler network fail-safe
  • 2.2 Tivoli Workload Scheduler for z/OS architecture
  • 2.2.1 Tivoli Workload Scheduler for z/OS configuration
  • 2.2.2 Tivoli Workload Scheduler for z/OS database objects
  • 2.2.3 Tivoli Workload Scheduler for z/OS plans
  • 2.2.4 Other Tivoli Workload Scheduler for z/OS features
  • 2.3 End-to-end scheduling architecture2.3.1 How end-to-end scheduling works
  • 2.3.2 Tivoli Workload Scheduler for z/OS end-to-end components
  • 2.3.3 Tivoli Workload Scheduler for z/OS end-to-end configuration
  • 2.3.4 Tivoli Workload Scheduler for z/OS end-to-end database objects
  • 2.3.5 Tivoli Workload Scheduler for z/OS end-to-end plans
  • 2.3.6 How to make the TWS for z/OS end-to-end fail-safe
  • 2.3.7 Tivoli Workload Scheduler for z/OS end-to-end benefits
  • 2.4 Job Scheduling Console and related components
  • 2.4.1 A brief introduction to the Tivoli Management Framework2.4.2 Job Scheduling Services (JSS)
  • 2.4.3 Connectors
  • Chapter 3. Planning, installation, and configuration of the TWS 8.1
  • 3.1 Planning end-to-end scheduling for TWS for z/OS
  • 3.1.1 Preventive Service Planning (PSP)
  • 3.1.2 Software ordering
  • 3.1.3 Tracker agents
  • 3.1.4 Workload Monitor
  • 3.1.5 System documentation
  • 3.1.6 EQQPDF
  • 3.1.7 Sharing hierarchical file system (HFS) cluster
  • 3.1.8 TCP/IP considerations
  • 3.1.9 Script repository
  • 3.1.10 Submitting user ID