Cargando…

Procurement strategies : a relationship-based approach /

Construction has been an industry characterised by disputes, fierce competitiveness and fragmentation - all major obstacles to development. Now, however, a relationship-based approach to project procurement, through partnering and alliancing, aims to bring about a fundamental change. This book addre...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Hampson, Keith
Otros Autores: Walker, Derek H. T.
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Chichester : John Wiley & Sons, 2008.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 EBOOKCENTRAL_ocn417822102
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |||||||||||
008 080909s2008 xxu o 000 0 eng
040 |a AU@  |b eng  |e pn  |c AU@  |d BTCTA  |d OCLCQ  |d UKDOC  |d OCLCF  |d OCLCQ  |d MERUC  |d EBLCP  |d IDEBK  |d CGU  |d OCLCQ  |d OCLCO  |d DEBSZ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d ZCU  |d ICG  |d AU@  |d OCLCQ  |d WYU  |d DKC  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 230191647  |a 437218635  |a 476171964 
020 |a 0470680369  |q (electronic bk.) 
020 |a 9780470680360  |q (electronic bk.) 
029 0 |a AU@  |b 000044388659 
029 1 |a AU@  |b 000053281910 
029 1 |a AU@  |b 000062467175 
029 1 |a DEBBG  |b BV044130126 
029 1 |a DEBSZ  |b 430494386 
035 |a (OCoLC)417822102  |z (OCoLC)230191647  |z (OCoLC)437218635  |z (OCoLC)476171964 
050 4 |a HD9715.A2 
082 0 4 |a 624.0687  |a 624/.068/7 
049 |a UAMI 
100 1 |a Hampson, Keith. 
245 1 0 |a Procurement strategies :  |b a relationship-based approach /  |c Keith Hampson and Derek Walker. 
260 |a Chichester :  |b John Wiley & Sons,  |c 2008. 
300 |a 1 online resource (1 volume) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
505 0 |a Procurement Strategies ; Contents; Authors and Contributors; Preface; Chapter 1 Introduction; 1.1 The structure of this book; 1.2 Implications of the current global work environment; 1.3 References; Part 1 PROCUREMENT SYSTEMS AND STRUCTURES; Chapter 2 Procurement Choices; 2.1 Traditional procurement options -- fixed price contracting; 2.2 Total package options -- BOO, BOT, BOOT; 2.3 Design and construct, novation and turnkey; 2.4 Construction management (CM) and project management (PM) and PM/CM; 2.5 Sequential negotiated work packages -- on-call contracting. 
505 8 |a 2.6 Guaranteed maximum price (GMP)2.7 Full cost reimbursable procurement; 2.8 Discussion -- procurement choice as design influence; 2.9 Chapter summary; 2.10 References; Chapter 3 Enterprise Networks, Partnering and Alliancing; 3.1 The development of enterprise networks; 3.2 Types of joint enterprise arrangements; 3.3 Australian partnering research study results; 3.4 USA partnering research study results; 3.5 Types of project partnering -- from cooperation to coalescence; 3.6 Requirements for Level 4 -- synergistic strategic partnerships. 
505 8 |a 3.7 Reasons for embarking on Level 4 -- synergistic strategic partnerships3.8 Developing a strategic alliance relationship; 3.9 Sustaining a strategic alliance relationship; 3.10 Case studies in project alliancing; 3.10.1 Wandoo B Offshore Oil Platform -- Western Australia; 3.10.2 The Andrew Drilling Platform -- North Sea UK; 3.10.3 East Spar Development -- Western Australia; 3.10.4 Fluor Daniel SECV -- Victoria; 3.10.5 Other alliance projects undertaken in Australia; 3.11 Chapter summary; 3.12 References; Chapter 4 Project Alliancing Member Organisation Selection. 
505 8 |a 4.1 Introduction -- Why form an alliance? -- General motivational issues4.1.1 Manufacturing and distribution industries (primarily product focused); 4.1.2 The airline industry (primarily service focused); 4.1.3 The engineering and construction industry (product and service focused); 4.1.4 The National Museum of Australia project; 4.2 The selection process for the National Museum of Australia project; 4.2.1 The design selection process; 4.2.2 The alliance construction team selection process; 4.2.3 Selection criteria; 4.3 Chapter summary; 4.4 References. 
505 8 |a Chapter 5 Managing Risk and Crises Resolution -- Business-as-Usual Versus Relationship-based Procurement Approaches5.1 Introduction -- risk, uncertainty and crises; 5.2 The process of preparing for and managing crises; 5.2.1 Monitoring; 5.2.2 Diagnosis; 5.2.3 Decision making and implementation; 5.2.4 Recovery and learning; 5.3 Countering dysfunction in managing crises; 5.3.1 Building solutions to problems; 5.3.2 The National Museum of Australia project; 5.4 Chapter summary; 5.5 References; Chapter 6 Enabling Improved Business Relationships -- How Information Technology Makes a Difference. 
520 |a Construction has been an industry characterised by disputes, fierce competitiveness and fragmentation - all major obstacles to development. Now, however, a relationship-based approach to project procurement, through partnering and alliancing, aims to bring about a fundamental change. This book addresses the critical relationship issues for a more collaborative and sustainable construction industry. It looks at how project procurement and project alliancing partner selection works, and how risk and crisis resolution are managed. It provides readers with guidance and models on how to put a relationship-based approach to procurement into practice, drawing on specific prototypes from an actual, successful project that can be adapted. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Construction industry  |x Management. 
650 0 |a Building trades  |x Management. 
650 0 |a Industrial procurement. 
650 6 |a Construction  |x Industrie  |x Gestion. 
650 6 |a Métiers de la construction  |x Gestion. 
650 6 |a Approvisionnement dans l'entreprise. 
650 7 |a Building trades  |x Management  |2 fast 
650 7 |a Construction industry  |x Management  |2 fast 
650 7 |a Industrial procurement  |2 fast 
700 1 |a Walker, Derek H. T. 
758 |i has work:  |a Procurement strategies (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCFrWxYDFXMWp3DrBrmGbkC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Hampson, Keith.  |t Procurement strategies.  |d Chichester : John Wiley & Sons, 2008  |w (DLC) 35001375 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=351375  |z Texto completo 
938 |a 123Library  |b 123L  |n 23001 
938 |a Baker and Taylor  |b BTCP  |n BK0007816133 
938 |a EBL - Ebook Library  |b EBLB  |n EBL351375 
994 |a 92  |b IZTAP