Cargando…

End-to-end scheduling with IBM Tivoli Workload Scheduler V 8.2 /

The beginning of the new century sees the data center with a mix of work, hardware, and operating systems previously undreamed of. Today's challenge is to manage disparate systems with minimal effort and maximum reliability. People experienced in scheduling traditional host-based batch work mus...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Gucer, Vasfi
Autor Corporativo: International Business Machines Corporation. International Technical Support Organization
Otros Autores: Lowry, Michael A., Knudsen, Finn Bastrup
Formato: Electrónico eBook
Idioma:Inglés
Publicado: [Place of publication not identified] : IBM, International Technical Support Organization, 2004.
Edición:1st ed.
Colección:IBM redbooks.
Temas:
Acceso en línea:Texto completo
Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 EBOOKCENTRAL_ocn137342191
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cn|||||||||
008 050512s2004 xxua ob 001 0 eng d
040 |a AZU  |b eng  |e pn  |c AZU  |d OQP  |d CUY  |d OCLCQ  |d DKDLA  |d ADU  |d E7B  |d OCLCO  |d OCLCQ  |d UMI  |d DEBSZ  |d OCLCA  |d OCLCQ  |d OCLCF  |d OCLCQ  |d EBLCP  |d COO  |d OCLCQ  |d AZK  |d LOA  |d COCUF  |d CNNOR  |d MOR  |d PIFBR  |d ZCU  |d MERUC  |d OCLCQ  |d OCLCO  |d U3W  |d BRL  |d STF  |d WRM  |d CEF  |d NRAMU  |d ICG  |d VT2  |d OCLCQ  |d OCLCA  |d AU@  |d WYU  |d OCLCO  |d A6Q  |d DKC  |d OCLCQ  |d OCLCO  |d SGP  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 466460051  |a 481700692  |a 614895503  |a 647469778  |a 722433084  |a 817716721  |a 939263488  |a 961540683  |a 962671619  |a 968282380  |a 988498465  |a 991922830  |a 1037468527  |a 1037910915  |a 1038585962  |a 1045546376  |a 1055374381  |a 1058058420  |a 1064043289  |a 1081273991  |a 1083585289 
020 |a 9780738491394 
020 |a 073849139X 
020 |z 073849139X 
029 1 |a AU@  |b 000050347948 
029 1 |a AU@  |b 000053014683 
029 1 |a AU@  |b 000060052210 
029 1 |a DEBBG  |b BV040903218 
029 1 |a DEBBG  |b BV044100519 
029 1 |a DEBSZ  |b 378272349 
029 1 |a DEBSZ  |b 381392805 
029 1 |a NZ1  |b 12041212 
035 |a (OCoLC)137342191  |z (OCoLC)466460051  |z (OCoLC)481700692  |z (OCoLC)614895503  |z (OCoLC)647469778  |z (OCoLC)722433084  |z (OCoLC)817716721  |z (OCoLC)939263488  |z (OCoLC)961540683  |z (OCoLC)962671619  |z (OCoLC)968282380  |z (OCoLC)988498465  |z (OCoLC)991922830  |z (OCoLC)1037468527  |z (OCoLC)1037910915  |z (OCoLC)1038585962  |z (OCoLC)1045546376  |z (OCoLC)1055374381  |z (OCoLC)1058058420  |z (OCoLC)1064043289  |z (OCoLC)1081273991  |z (OCoLC)1083585289 
037 |a CL0500000175  |b Safari Books Online 
050 4 |a QA76.9.D5  |b G8 2004eb 
082 0 4 |a 004/.36  |2 22 
049 |a UAMI 
100 1 |a Gucer, Vasfi. 
245 1 0 |a End-to-end scheduling with IBM Tivoli Workload Scheduler V 8.2 /  |c [Vasfi Gucer, Michael A. Lowry, Finn Bastrup Knudsen]. 
250 |a 1st ed. 
260 |a [Place of publication not identified] :  |b IBM, International Technical Support Organization,  |c 2004. 
300 |a 1 online resource (xiv, 362 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a data file  |2 rda 
490 1 |a IBM redbooks 
504 |a Includes bibliographical references and index. 
588 0 |a Print version record. 
520 |a The beginning of the new century sees the data center with a mix of work, hardware, and operating systems previously undreamed of. Today's challenge is to manage disparate systems with minimal effort and maximum reliability. People experienced in scheduling traditional host-based batch work must now manage distributed systems, and those working in the distributed environment must take responsibility for work running on the corporate OS/390 system. This IBM Redbooks publication considers how best to provide end-to-end scheduling using IBM Tivoli Workload Scheduler Version 8.2, both distributed (previously known as Maestro) and mainframe (previously known as OPC) components. In this book, we provide the information for installing the necessary Tivoli Workload Scheduler 8.2 software components and configuring them to communicate with each other. In addition to technical information, we consider various scenarios that may be encountered in the enterprise and suggest practical solutions. We describe how to manage work and dependencies across both environments using a single point of control. We believe that this book will be a valuable reference for IT specialists who implement end-to-end scheduling with Tivoli Workload Scheduler 8.2. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
590 |a O'Reilly  |b O'Reilly Online Learning: Academic/Public Library Edition 
630 0 0 |a IBM Tivoli workload scheduler. 
630 0 7 |a IBM Tivoli workload scheduler.  |2 blmlsh 
630 0 7 |a IBM Tivoli workload scheduler  |2 fast 
650 0 |a Electronic data processing  |x Distributed processing. 
650 0 |a Production scheduling. 
650 6 |a Traitement réparti. 
650 6 |a Ordonnancement (Gestion) 
650 7 |a Electronic data processing  |x Distributed processing  |2 fast 
650 7 |a Production scheduling  |2 fast 
700 1 |a Lowry, Michael A. 
700 1 |a Knudsen, Finn Bastrup. 
710 2 |a International Business Machines Corporation.  |b International Technical Support Organization. 
758 |i has work:  |a End-to-end scheduling with IBM Tivoli Workload Scheduler V 8.2 (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGpYbrJtxYGQMgtYt9FPDC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Gucer, Vasfi.  |t End-to-end scheduling with IBM Tivoli Workload Scheduler V 8.2.  |b 1st ed.  |d [S.l.] : IBM, International Technical Support Organization, 2004  |w (DLC) 2005275057 
830 0 |a IBM redbooks. 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=3306594  |z Texto completo 
856 4 0 |u https://learning.oreilly.com/library/view/~/073849139X/?ar  |z Texto completo 
938 |a EBL - Ebook Library  |b EBLB  |n EBL3306594 
938 |a ebrary  |b EBRY  |n ebr10112614 
994 |a 92  |b IZTAP