The Role of Communication in Large Infrastructure : the Bumbuna Hydroelectric Project in Post-Conflict Sierra Leone.
"Infrastructure development in the past was often implemented without adequately taking into consideration the possible negative environmental and social impacts. Drawing from the experience of the Bumbuna Hydropower project in Sierra Leone, this paper proposes to complement safeguard policies...
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Autor Corporativo: | |
Otros Autores: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Washington, D.C. :
World Bank,
©2006.
|
Colección: | World Bank working paper ;
no. 84. World Bank e-Library. |
Temas: | |
Acceso en línea: | Texto completo |
MARC
LEADER | 00000cam a22000004a 4500 | ||
---|---|---|---|
001 | EBOOKCENTRAL_ocm70710014 | ||
003 | OCoLC | ||
005 | 20240329122006.0 | ||
006 | m o d | ||
007 | cr mn||||||||| | ||
008 | 060524s2006 dcuab ob i000 0 eng c | ||
010 | |z 2006047376 | ||
040 | |a PUL |b eng |e pn |c PUL |d N$T |d CUS |d MEAUC |d LGG |d EBLCP |d IDEBK |d OCLCQ |d MERUC |d CCO |d E7B |d TUU |d OCLCQ |d FVL |d OCLCQ |d OCLCO |d OCLCQ |d OCLCF |d OCLCQ |d BWS |d YDXCP |d OCLCQ |d AU@ |d BDX |d OCLCQ |d COO |d AZK |d CNNLC |d CNNOR |d MOR |d PIFBR |d DCWBL |d OCLCQ |d ZCU |d OCLCQ |d WY@ |d U3W |d LUE |d CAUOI |d BRL |d STF |d OCLCO |d WRM |d OCLCA |d CEF |d NRAMU |d ICG |d VT2 |d OCLCQ |d OCLCO |d WYU |d G3B |d TKN |d OCLCQ |d OCLCO |d MERER |d OCLCQ |d DKC |d OCLCQ |d OL$ |d OCLCQ |d OCLCO |d YOU |d OCLCQ |d VLY |d INARC |d OCLCQ |d OCLCO |d ANO |d OCLCQ |d NNQ |d SFB |d OCLCQ |d OCLCO |d OCLCL | ||
019 | |a 271071551 |a 466448566 |a 473840808 |a 475313902 |a 508057748 |a 560138394 |a 647521357 |a 722479771 |a 728028761 |a 744968496 |a 813537196 |a 814457832 |a 821691966 |a 824551530 |a 888451797 |a 897009200 |a 961571004 |a 962611507 |a 992277771 |a 993917994 |a 1029506291 |a 1037434950 |a 1045534083 |a 1058043965 |a 1120877775 |a 1148163148 |a 1162060249 |a 1290070661 |a 1371448978 |a 1377823334 | ||
020 | |a 9780821366820 | ||
020 | |a 0821366823 | ||
020 | |a 0821366831 |q (electronic bk.) | ||
020 | |a 9780821366837 |q (electronic bk.) | ||
020 | |a 6610516359 | ||
020 | |a 9786610516353 | ||
020 | |a 1280516356 | ||
020 | |a 9781280516351 | ||
024 | 3 | |a 9780821366820 | |
029 | 1 | |a AU@ |b 000040330622 | |
029 | 1 | |a AU@ |b 000053226305 | |
029 | 1 | |a DEBBG |b BV044138545 | |
029 | 1 | |a NZ1 |b 12043582 | |
029 | 1 | |a NZ1 |b 15290052 | |
035 | |a (OCoLC)70710014 |z (OCoLC)271071551 |z (OCoLC)466448566 |z (OCoLC)473840808 |z (OCoLC)475313902 |z (OCoLC)508057748 |z (OCoLC)560138394 |z (OCoLC)647521357 |z (OCoLC)722479771 |z (OCoLC)728028761 |z (OCoLC)744968496 |z (OCoLC)813537196 |z (OCoLC)814457832 |z (OCoLC)821691966 |z (OCoLC)824551530 |z (OCoLC)888451797 |z (OCoLC)897009200 |z (OCoLC)961571004 |z (OCoLC)962611507 |z (OCoLC)992277771 |z (OCoLC)993917994 |z (OCoLC)1029506291 |z (OCoLC)1037434950 |z (OCoLC)1045534083 |z (OCoLC)1058043965 |z (OCoLC)1120877775 |z (OCoLC)1148163148 |z (OCoLC)1162060249 |z (OCoLC)1290070661 |z (OCoLC)1371448978 |z (OCoLC)1377823334 | ||
037 | |a 9780821366820 |b 00028989 | ||
042 | |a pcc | ||
043 | |a f-sl--- | ||
050 | 4 | |a HC1065.Z9 |b C36 2006 | |
072 | 7 | |a BUS |x 054000 |2 bisacsh | |
072 | 7 | |a KNBL |2 bicssc | |
082 | 0 | 4 | |a 333.91/409664 |2 22 |
049 | |a UAMI | ||
100 | 1 | |a Mazzei, Leonardo, |d 1973- |1 https://id.oclc.org/worldcat/entity/E39PCjBmy4vwx8XbWMYrHDqxXd | |
245 | 1 | 4 | |a The Role of Communication in Large Infrastructure : |b the Bumbuna Hydroelectric Project in Post-Conflict Sierra Leone. |
260 | |a Washington, D.C. : |b World Bank, |c ©2006. | ||
300 | |a 1 online resource (xi, 42 pages) : |b illustrations, map | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
347 | |a data file | ||
380 | |a Bibliography | ||
490 | 1 | |a World Bank working paper, |x 1726-5878 ; |v no. 84 | |
504 | |a Includes bibliographical references (pages 41-42). | ||
505 | 0 | |a 1. Introduction -- 2. The communication-based assessment (CBA) -- 3. Communication for operational support -- 4. Lessons learned -- 5. Conclusions. | |
520 | 1 | |a "Infrastructure development in the past was often implemented without adequately taking into consideration the possible negative environmental and social impacts. Drawing from the experience of the Bumbuna Hydropower project in Sierra Leone, this paper proposes to complement safeguard policies by establishing, at the beginning of the project identification phase, two-way communication mechanisms and a continuous consultation process, allowing the government and the donors to interact with key stakeholders." "The book proposes an integrated approach where communication is seen as a powerful analytical tool, and as an instrument to support the decisionmaking process by enabling it to be more transparent, consensual, and responsive to the beneficiaries' need, thus avoiding future problems and criticisms, which might delay and even bring the project to a halt at a later stage."--Jacket | |
588 | 0 | |a Print version record. | |
546 | |a English. | ||
590 | |a ProQuest Ebook Central |b Ebook Central Academic Complete | ||
610 | 2 | 0 | |a Bumbuna Hydroelectric Project. |
610 | 2 | 7 | |a Bumbuna Hydroelectric Project |2 fast |
650 | 0 | |a Infrastructure (Economics) |z Sierra Leone. | |
650 | 0 | |a Communication in rural development |z Sierra Leone. | |
650 | 0 | |a Water-power |z Sierra Leone. | |
650 | 0 | |a Hydroelectric power plants |z Sierra Leone. | |
650 | 6 | |a Communication en développement rural |z Sierra Leone. | |
650 | 6 | |a Centrales hydroélectriques |z Sierra Leone. | |
650 | 7 | |a BUSINESS & ECONOMICS |x Real Estate |x General. |2 bisacsh | |
650 | 7 | |a Communication in rural development |2 fast | |
650 | 7 | |a Hydroelectric power plants |2 fast | |
650 | 7 | |a Infrastructure (Economics) |2 fast | |
650 | 7 | |a Water-power |2 fast | |
651 | 7 | |a Sierra Leone |2 fast |1 https://id.oclc.org/worldcat/entity/E39PBJgCPdTtkJj9bqdWtyM773 | |
700 | 1 | |a Scuppa, Gianmarco, |d 1967- |1 https://id.oclc.org/worldcat/entity/E39PCjH4mtvXDPtXHF3D4f3rtq | |
710 | 2 | |a World Bank. | |
758 | |i has work: |a The role of communication in large infrastructure (Text) |1 https://id.oclc.org/worldcat/entity/E39PCFQ9Xh7RHBK9b4GhFppWrC |4 https://id.oclc.org/worldcat/ontology/hasWork | ||
776 | 0 | 8 | |i Print version: |a Mazzei, Leonardo, 1973- |t Role of Communication in Large Infrastructure. |d Washington, D.C. : World Bank, ©2006 |w (DLC) 2006047376 |
830 | 0 | |a World Bank working paper ; |v no. 84. |x 1726-5878 | |
830 | 0 | |a World Bank e-Library. | |
856 | 4 | 0 | |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=459590 |z Texto completo |
938 | |a Brodart |b BROD |n 06722067 |c $10.00 | ||
938 | |a EBL - Ebook Library |b EBLB |n EBL459590 | ||
938 | |a ebrary |b EBRY |n ebr10132033 | ||
938 | |a EBSCOhost |b EBSC |n 164219 | ||
938 | |a ProQuest MyiLibrary Digital eBook Collection |b IDEB |n 51635 | ||
938 | |a Internet Archive |b INAR |n roleofcommunicat0000mazz | ||
938 | |a YBP Library Services |b YANK |n 2457200 | ||
994 | |a 92 |b IZTAP |