Cargando…

Online Scheduling in Manufacturing A Cumulative Delay Approach /

Online scheduling is recognized as the crucial decision-making process of production control at a phase of "being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as av...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autores principales: Suwa, Haruhiko (Autor), Sandoh, Hiroaki (Autor)
Autor Corporativo: SpringerLink (Online service)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: London : Springer London : Imprint: Springer, 2013.
Edición:1st ed. 2013.
Temas:
Acceso en línea:Texto Completo

MARC

LEADER 00000nam a22000005i 4500
001 978-1-4471-4561-5
003 DE-He213
005 20220114151717.0
007 cr nn 008mamaa
008 121026s2013 xxk| s |||| 0|eng d
020 |a 9781447145615  |9 978-1-4471-4561-5 
024 7 |a 10.1007/978-1-4471-4561-5  |2 doi 
050 4 |a HD28-70 
072 7 |a TBC  |2 bicssc 
072 7 |a KJM  |2 bicssc 
072 7 |a TEC000000  |2 bisacsh 
072 7 |a TBC  |2 thema 
072 7 |a KJM  |2 thema 
082 0 4 |a 658.5  |2 23 
100 1 |a Suwa, Haruhiko.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
245 1 0 |a Online Scheduling in Manufacturing  |h [electronic resource] :  |b A Cumulative Delay Approach /  |c by Haruhiko Suwa, Hiroaki Sandoh. 
250 |a 1st ed. 2013. 
264 1 |a London :  |b Springer London :  |b Imprint: Springer,  |c 2013. 
300 |a X, 158 p.  |b online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a text file  |b PDF  |2 rda 
505 0 |a Scheduling Strategies Coping with Uncertainty -- When-to-Schedule Policy Using Cumulative Delay -- Cumulative Delay Based Periodic Rescheduling -- Cumulative Delay Based Reactive Scheduling -- Hybrid When-to-Schedule Policies with Cumulative Delay -- Discussions -- Conclusions. 
520 |a Online scheduling is recognized as the crucial decision-making process of production control at a phase of "being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the practical decision-making: 1. To reduce frequent schedule revisions which do not necessarily improve a current situation with much expense for its operation; 2. To avoid overreacting to disturbances dependent on strongly an individual shop floor circumstance; and 3. To simplify the monitoring process of a schedule status. Online Scheduling in Manufacturing will be of interest to both practitioners and researchers who work in planning and scheduling in manufacturing. Readers will find the importance of when-to-revise policies during a schedule execution and their influences on scheduling results. 
650 0 |a Industrial Management. 
650 0 |a Production management. 
650 1 4 |a Industrial Management. 
650 2 4 |a Operations Management. 
700 1 |a Sandoh, Hiroaki.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
710 2 |a SpringerLink (Online service) 
773 0 |t Springer Nature eBook 
776 0 8 |i Printed edition:  |z 9781447145608 
776 0 8 |i Printed edition:  |z 9781447145622 
776 0 8 |i Printed edition:  |z 9781447158271 
856 4 0 |u https://doi.uam.elogim.com/10.1007/978-1-4471-4561-5  |z Texto Completo 
912 |a ZDB-2-ENG 
912 |a ZDB-2-SXE 
950 |a Engineering (SpringerNature-11647) 
950 |a Engineering (R0) (SpringerNature-43712)